Steam turbine1. Brněnská strojírna
Turbogenerator set 25MW
Steam turbine
1. Brněnská strojírna
Turbogenerator set 25MW
EXW VB د مالياتي ارزښت له مالیې سره علاوه
€ ۶۸۰٬۰۰۰
د جوړېدو کال
۱۹۸۵
حالت
استعمال شوی
ځای
د چیک جمهوریت 

انځورونه ښیي
نقشه ښکاره کړئ
د ماشین په اړه معلومات
- د ماشین نوم:
- Steam turbine
- تولیدوونکی:
- 1. Brněnská strojírna
- د جوړېدو کال:
- ۱۹۸۵
- حالت:
- استعمال شوی
- فعالیت:
- په بشپړه توګه فعال
بیه او موقعیت
EXW VB د مالياتي ارزښت له مالیې سره علاوه
€ ۶۸۰٬۰۰۰
- ځای:
- 689/117, Vratimovská, 719 00 Slezská Ostrava
تماس وکړئ
تخنیکي جزییات
- فشار:
- ۹۰ بار
- توان:
- ۲۵ کیلو واټ (۳۳٫۹۹ اسبه قوه)
- د تګ فریکوینسي:
- ۵۰ Hz
- د ننوتي برېښنا جريان ډول:
- د هوا سړونکی
- تودېخه:
- ۵۱۵ °C
- ټول وزن:
- ۴۵٬۰۰۰ کيلوګرام
- ټوله لوړوالی:
- ۵٬۰۰۰ م م
- اعظمي دوراني سرعت:
- ۳٬۰۰۰ آر پيايم
- د یخولو ډول:
- اوبه
د وړاندیز توضیحات
- اعلان ID:
- A19313346
- د حوالې شمېره:
- TG1
- تازه کول:
- وروستي ځل په ۱۶.۰۳.۱۴۰۴
تشريح
1. Brněnská strojírna, Turbogenerator set, back pressure steam turbine 25MW
Manufacturer: 1. Brněnská strojírna
Power: 25 000 kW
Type: R25-9/1,9
RPM: 3000 / min
Steam pressure: 90 bar
Output steam pressure: 18 bar
Steam temperature: 515 ºC
The equipment is from year 1985 and has received all maintenance required for the maximum reliability, availability and capacity.
Size: 3 000 x 3 000 x 5 100 mm
Weight: 45 000 kg
Gsdpfx Aewqp Acebkjkc
Generator, gearbox, oil system and all related electro and InC equipment included.
We will send all technical data on request.
Maintenece:
The machine has been regularly maintained and serviced since its commissioning. GO and SO have been carried out at intervals of about 5 years according to the actual condition. The O&M was carried out by the turbine manufacturer or a specialist company in the field.
The last O&M was carried out in 2007 for a total amount of 44.2 million EUR. The following repairs were carried out:
- repair of the rotor with new blading
- repair of the stator flow section with new blading
- Replacement of quick-action and control valve blocks
- replacement of the control gear on the machine,
- reconstruction of the control system
- repair of oil. system,
- revision of steam system, valves, drainage
The last repair (SO) was carried out in 2020 for a total amount of 16.2 million CZK. The following repairs were carried out:
- revision of the flow section of the turbine, cleaning, replacement of seals, rotor balancing
- oil revision and cleaning. Revision of the rotor, cleaning of the rotor, revision of the rotor system, installation of full flow filtration
- complete repair of the KUP with repiping,
- revision and repair of the turbine control and the control safety system
- inspection of steam pipelines and valves
Regular maintenance and servicing was carried out during operation, with further periodic repairs planned for 2027.
Manufacturer: 1. Brněnská strojírna
Power: 25 000 kW
Type: R25-9/1,9
RPM: 3000 / min
Steam pressure: 90 bar
Output steam pressure: 18 bar
Steam temperature: 515 ºC
The equipment is from year 1985 and has received all maintenance required for the maximum reliability, availability and capacity.
Size: 3 000 x 3 000 x 5 100 mm
Weight: 45 000 kg
Gsdpfx Aewqp Acebkjkc
Generator, gearbox, oil system and all related electro and InC equipment included.
We will send all technical data on request.
Maintenece:
The machine has been regularly maintained and serviced since its commissioning. GO and SO have been carried out at intervals of about 5 years according to the actual condition. The O&M was carried out by the turbine manufacturer or a specialist company in the field.
The last O&M was carried out in 2007 for a total amount of 44.2 million EUR. The following repairs were carried out:
- repair of the rotor with new blading
- repair of the stator flow section with new blading
- Replacement of quick-action and control valve blocks
- replacement of the control gear on the machine,
- reconstruction of the control system
- repair of oil. system,
- revision of steam system, valves, drainage
The last repair (SO) was carried out in 2020 for a total amount of 16.2 million CZK. The following repairs were carried out:
- revision of the flow section of the turbine, cleaning, replacement of seals, rotor balancing
- oil revision and cleaning. Revision of the rotor, cleaning of the rotor, revision of the rotor system, installation of full flow filtration
- complete repair of the KUP with repiping,
- revision and repair of the turbine control and the control safety system
- inspection of steam pipelines and valves
Regular maintenance and servicing was carried out during operation, with further periodic repairs planned for 2027.
عرضوونکی
یادونه: وړیا راجستر شئ یا ننوت کړئ، ترڅو ټول معلومات ترلاسه کړئ.
له دې نیټې راجستر شوی: 2025
پوښتنه واستوئ
تلیفون & فاکس
+420 370 ... اعلانونه
دغه اعلانونه هم ښايي ستاسو علاقه پیدا کړي.
کوچنی اعلان

۴٬۳۶۴ km
1. Brněnská strojírnaTurbogenerator set 25MW
کوچنی اعلان

۴٬۳۶۵ km
1. Brněnská strojírnaTurbogenerator set 25MW
ستاسو اعلان په بریالیتوب سره پاک شو
يوه تېروتنه رامنځته شوه