Machining centerGROB-WERKE
G720F
Machining center
GROB-WERKE
G720F
د جوړېدو کال
۲۰۲۳
حالت
نمایشګاه ماشين
ځای
Mindelheim 

انځورونه ښیي
نقشه ښکاره کړئ
د ماشین په اړه معلومات
- د ماشین نوم:
- Machining center
- تولیدوونکی:
- GROB-WERKE
- موډل:
- G720F
- د جوړېدو کال:
- ۲۰۲۳
- حالت:
- لکه نوی (نمایشي ماشین)
بیه او موقعیت
- ځای:
- Industriestraße 4, 87719 Mindelheim, DE
تماس وکړئ
تخنیکي جزییات
- د X محور سفر فاصله:
- ۱٬۴۵۰ م م
- د Y محور مسافه:
- ۱٬۲۰۰ م م
- د Z محور د حرکت فاصله:
- ۱٬۰۳۵ م م
د وړاندیز توضیحات
- اعلان ID:
- A15979171
- تازه کول:
- وروستي ځل په ۲۵.۰۹.۱۴۰۳
تشريح
Highlights:
- fastest chip-to-chip time in this workspace dimension
- Optimum footprint
- Automation “ready”
_____
G720F machining center
X-axis travel = 1450 mm
Y-axis travel = 1200 mm
Z-axis travel = 1035 mm
Interference diameter 1,500 mm (2x)
table load 2x 750 kg
Work area lighting
Machine control Siemens Sinumerik ONE
HT10 handheld control unit
Motorized spindle 17,000 min-1, 64 Nm
GROB spindle diagnosis (GSD) for twin-spindle machines
Tool magazine, HSK-A-63 with 80 (2x40) tool pockets
Tool loading lift for parallel loading and unloading of tools during machining time
mechanic-tactile tool breakage check
HSK taper shaft cleaning
Air blow-off gun
Inspection window for viewing the tool change area/tool robot
Gkodotiyzdspfx Abkjc
Lighting in the tool change area/tool robot
Minimum quantity lubrication unit for two spindles as single-channel
Minimum quantity lubrication unit pressure booster
Decentralized exhaust system MQL
Scraper conveyor with wear plate
Basic installation Clamping functionality
Evaluation unit for monitoring support
evaluation unit for clamping monitoring - volume flow
Preparation for process-related measurement (Renishaw)
Renishaw RMP400 extra long measuring probe
Loading, directly into the machine by the operator
Two-hand operation, incl. automatic opening at the end of the cycle
HVO console
Preparation for direct loading into the machine by robot
Machine status light
- fastest chip-to-chip time in this workspace dimension
- Optimum footprint
- Automation “ready”
_____
G720F machining center
X-axis travel = 1450 mm
Y-axis travel = 1200 mm
Z-axis travel = 1035 mm
Interference diameter 1,500 mm (2x)
table load 2x 750 kg
Work area lighting
Machine control Siemens Sinumerik ONE
HT10 handheld control unit
Motorized spindle 17,000 min-1, 64 Nm
GROB spindle diagnosis (GSD) for twin-spindle machines
Tool magazine, HSK-A-63 with 80 (2x40) tool pockets
Tool loading lift for parallel loading and unloading of tools during machining time
mechanic-tactile tool breakage check
HSK taper shaft cleaning
Air blow-off gun
Inspection window for viewing the tool change area/tool robot
Gkodotiyzdspfx Abkjc
Lighting in the tool change area/tool robot
Minimum quantity lubrication unit for two spindles as single-channel
Minimum quantity lubrication unit pressure booster
Decentralized exhaust system MQL
Scraper conveyor with wear plate
Basic installation Clamping functionality
Evaluation unit for monitoring support
evaluation unit for clamping monitoring - volume flow
Preparation for process-related measurement (Renishaw)
Renishaw RMP400 extra long measuring probe
Loading, directly into the machine by the operator
Two-hand operation, incl. automatic opening at the end of the cycle
HVO console
Preparation for direct loading into the machine by robot
Machine status light
عرضوونکی
یادونه: وړیا راجستر شئ یا ننوت کړئ، ترڅو ټول معلومات ترلاسه کړئ.
له دې نیټې راجستر شوی: 2019
پوښتنه واستوئ
تلیفون & فاکس
+49 8261 ... اعلانونه
ستاسو اعلان په بریالیتوب سره پاک شو
يوه تېروتنه رامنځته شوه