Roller conveyorSand filtration
Sand filtration 400 m3/h
Roller conveyor
Sand filtration
Sand filtration 400 m3/h
VB د مالياتي ارزښت له مالیې سره علاوه
€ ۹۰٬۰۰۰
حالت
استعمال شوی
ځای
Ostrava 

انځورونه ښیي
نقشه ښکاره کړئ
د ماشین په اړه معلومات
بیه او موقعیت
VB د مالياتي ارزښت له مالیې سره علاوه
€ ۹۰٬۰۰۰
- ځای:
- Ostrava, Česko
تماس وکړئ
د وړاندیز توضیحات
- اعلان ID:
- A19999760
- تازه کول:
- وروستي ځل په ۲۴.۰۶.۱۴۰۴
تشريح
Total flow of clarified water through PF 1 – 5 or PF 6 – 9 is 400 m³/h.
Filter diameter: 3,000 mm
Filter media - type PR 1 – 1.6
- Grain size: 1 – 1.6 mm
- Bed height: 1,100 mm
Operation:
Maximum filter capacity: 100 m³/h
Filtration rate: 14.3 m/h
Backwashing:
Backwash water flow: 70 m³/h
Upflow velocity: 10 m/h
Backwash air flow: 385 Nm³/h
The PF units are divided into two sections: PF1-5 (old installation) and PF6-9 (new installation). Only one section operates at a time according to operational requirements. The overall workload is approximately balanced, so each section runs about 4,400 hours annually. The sand filters are regularly backwashed after each operational cycle (80 hours) or when the pressure loss reaches ΔP 25 kPa. The system is fully operational.
PF Reconstruction:
PF1-5: 10.11.2015 – complete replacement of sand, nozzles, and shell surface maintenance
PF6-9: 13.7.2018 – complete replacement of sand, nozzles, and shell surface maintenance.
Gedpfxjxcnauo Abkjuh
دغه اعلان په اتوماتيک ډول ژباړل شوی. د ژباړې تېروتنې کېدای شي موجود وي.
Filter diameter: 3,000 mm
Filter media - type PR 1 – 1.6
- Grain size: 1 – 1.6 mm
- Bed height: 1,100 mm
Operation:
Maximum filter capacity: 100 m³/h
Filtration rate: 14.3 m/h
Backwashing:
Backwash water flow: 70 m³/h
Upflow velocity: 10 m/h
Backwash air flow: 385 Nm³/h
The PF units are divided into two sections: PF1-5 (old installation) and PF6-9 (new installation). Only one section operates at a time according to operational requirements. The overall workload is approximately balanced, so each section runs about 4,400 hours annually. The sand filters are regularly backwashed after each operational cycle (80 hours) or when the pressure loss reaches ΔP 25 kPa. The system is fully operational.
PF Reconstruction:
PF1-5: 10.11.2015 – complete replacement of sand, nozzles, and shell surface maintenance
PF6-9: 13.7.2018 – complete replacement of sand, nozzles, and shell surface maintenance.
Gedpfxjxcnauo Abkjuh
دغه اعلان په اتوماتيک ډول ژباړل شوی. د ژباړې تېروتنې کېدای شي موجود وي.
عرضوونکی
یادونه: وړیا راجستر شئ یا ننوت کړئ، ترڅو ټول معلومات ترلاسه کړئ.
له دې نیټې راجستر شوی: 2025
پوښتنه واستوئ
تلیفون & فاکس
+420 370 ... اعلانونه
ستاسو اعلان په بریالیتوب سره پاک شو
يوه تېروتنه رامنځته شوه